Prefabricated pipe systems for project implementation are produced at the central prefabrication facility in Frankleben based on the isometrics provided (see PMS).
The following materials are used in the prefabrication process:
General construction steels, boiler plates, cast steel, fine grain structural
steels (e.g. P235 TR1, P235 G1TH, P355 N)
heat-resistant steels (e.g. 13CrMo 4-5, 10CrMo 9-10, X 10CrMo VNb 9-1)
– Low temperature steels/nickel-alloy steels (e.g. 12Ni14)