Moorburg
Power Station

The entire piping system for the new Moorburg power station (double block coal plant with a block output of 820 MW) in Hamburg was efficiently planned and constructed. IMO also acted as GMC for the primary water cooling system.

Scope of the work

  • Engineering
  • Fabrication, supply and assembly of
    – approx. 970 t of pipes made from C-steel, stainless steel, fibre-reinforced
    plastics and PE
    – approx. 267 t of pipe supports
    – low pressure piping for primary and secondary cooling water
    – water and utility systems
  • Wall and ceiling bushings
  • Labeling
  • Fittings
  • Insulation, scaffolding, transport, material management
  • Quality assurance
  • Commissioning, trial operation
  • Documentation