The entire piping system for the new Moorburg power station (double block coal plant with a block output of 820 MW) in Hamburg was efficiently planned and constructed. IMO also acted as GMC for the primary water cooling system.
Scope of the work
Engineering
Fabrication, supply and assembly of – approx. 970 t of pipes made from C-steel, stainless steel, fibre-reinforced
plastics and PE – approx. 267 t of pipe supports – low pressure piping for primary and secondary cooling water – water and utility systems
Wall and ceiling bushings
Labeling
Fittings
Insulation, scaffolding, transport, material management